Project Background
Program:
Basement:
• kitchen
• room service
•Hammam+ cloakroom
• bathroom with shower
• clear up
• technical room
• English court
•Garage
Ground floor:
• European fairs
• Moroccan lounge
• dining room
• sanitary
• office
Floor:
• parental Suite
• two junior suites
Program:
Basement:
• kitchen
• room service
•Hammam+ cloakroom
• bathroom with shower
• clear up
• technical room
• English court
•Garage
Ground floor:
• European fairs
• Moroccan lounge
• dining room
• sanitary
• office
Floor:
• parental Suite
• two junior suites
Architectural Construction Drawings - Building Construction
Program:
Basement:
• kitchen
• room service
•Hammam+ cloakroom
• bathroom with shower
• clear up
• technical room
• English court
•Garage
Ground floor:
• European fairs
• Moroccan lounge
• dining room
• sanitary
• office
Floor:
• parental Suite
• two junior suites
Floor Plan
Architectural Renderings(Drawing/Photo)
Seismic Design
Rules and regulations:
The land is located in an isolated villa subdivision, so in se
Referring to the specifications we have the coefficient of land use
(C.U.S) of 35%.
The building surface on the floor of buildings should not
Exceed the 80% surface area of the DRC.
Basements are allowed within the limits of the constructed surface, and the
Ceiling height must be 2.50m maximum and the height
Maximum construction is 8m cet i.e RDC+ floor.
Comments
Feedback from Buyer