Project Background
The project land is oriented east-west, and the terrain is higher in the east and lower in the west, with a maximum height difference of about 25 meters. There is a fortress with a height difference of about 16 meters along the first and second phase lines. The east side is lower than Longting Road, with a height difference of about 5 meters. Fort Kan. There is a gas station on the southeast side. The west side is connected to the planned road.
Exterior Renderings
Carefully build a future-oriented hospital that is ecological, intelligent, humane, research-based, innovative and open
Floor Plan
floor plan
Elevation Plan
Elevation
Section Plan
Sectional view
Comments
Feedback from Buyer