Project Background
WORKMANSHIP : THE WORK THROUGHOUT SHALL BE EXECUTED
IN THE BEST AND MOST THROUGH MANNER KNOW TO TRADE AND
TO THE SATISFACTION OP THE OWNER OR ENGINEER IN CHARGE.
Interior Renderings
1. ALL WORKS SHALL BE IN ACCORDANCE AND CONFORM TO THE
NATIONAL FIRE PROTECTION ASSOCIATION OF THE (NFPA-13) AND
FIRE CODE OF THE PHILIPPINES.
2. ALL WORKS SHALL BE DONE UNDER THE IMMEDIATE
SUPERVISION OF THE DULY QUALIFIED AND COMPETENT MECHANICAL
ENGINEER.
3. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE NEW
UL / FM & NFPA APPROVED TYPE FOR LOCATION AND PURPOSES.
ALL ADDITIONAL BRANCH LINES AND DROPS SHALL BE B.I.
PIPES SCH. 40 AND SHALL BE PROVIDED WITH ADEQUATE PIPE
HANGERS (ADJUSTABLE SWIVEL TYPE) AND BE PAINTED WITH PRIMER
WORKMANSHIP : THE WORK THROUGHOUT SHALL BE EXECUTED
IN THE BEST AND MOST THROUGH MANNER KNOW TO TRADE AND
TO THE SATISFACTION OP THE OWNER OR ENGINEER IN CHARGE.
1. ALL WORKS SHALL BE IN ACCORDANCE AND CONFORM TO THE
NATIONAL FIRE PROTECTION ASSOCIATION OF THE (NFPA-13) AND
FIRE CODE OF THE PHILIPPINES.
2. ALL WORKS SHALL BE DONE UNDER THE IMMEDIATE
SUPERVISION OF THE DULY QUALIFIED AND COMPETENT MECHANICAL
ENGINEER.
3. ALL MATERIALS AND EQUIPMENT TO BE USED SHALL BE NEW
UL / FM & NFPA APPROVED TYPE FOR LOCATION AND PURPOSES.
ALL ADDITIONAL BRANCH LINES AND DROPS SHALL BE B.I.
PIPES SCH. 40 AND SHALL BE PROVIDED WITH ADEQUATE PIPE
HANGERS (ADJUSTABLE SWIVEL TYPE) AND BE PAINTED WITH PRIMER
WORKMANSHIP : THE WORK THROUGHOUT SHALL BE EXECUTED
IN THE BEST AND MOST THROUGH MANNER KNOW TO TRADE AND
TO THE SATISFACTION OP THE OWNER OR ENGINEER IN CHARGE.
Comments
Feedback from Buyer