x
Post
Consult
IM
Feedback
Top
*标题:
*内容描述:
Home Design Requirement Architecture Schematic Design for 959 ㎡ Factory

Publisher

To view this buyer‘s contact information please Sign In Now ! Not a member yet?It takes less than a minute to Join Free Now !
You can contact the client through email, phone, and WhatsApp
Requirement No: 17337984718872928275 Published on: 2024-12-10 15:13:53
Architecture Schematic Design for 959 ㎡ Factory
Design Service Type: Architecture Planning and Schematic Design (Floor Plan, Elevation, Section, Renderings)
Drawing Type:
Project Type: Factory
Number of Buildings: 1
Project Location: Northern, Ghana, West Africa
Total Floor Area: 959 m²
Project Grade: Super-luxury (6Star-level)
Language (Spoken):
English
Language (Written):
English
Design Description:
*Style:* Modern Industrial Chic with a touch of Sustainability. The factory will have a sleek, modern aesthetic with clean lines, minimal ornamentation, and an emphasis on functionality. The use of natural light, green walls, and living roofs will add a touch of warmth and sustainability to the design. *Design Scope:* The design scope will include the entire factory layout, from the entrance to the production floor, packaging area, warehouse, and administrative offices. The design will also incorporate sustainable features, such as rainwater harvesting, solar panels, and energy-efficient equipment. *Design Grade:* Premium. The factory will be designed to meet the highest standards of quality, safety, and efficiency. The design will incorporate advanced technologies, such as automation and robotics, to optimize production and minimize waste. *Desired Design (Modified):* A hybrid of the "Cellular" and "Linear" design approaches. The factory will be divided into separate cells or modules, each dedicated to a specific function, such as production, packaging, or warehousing. The linear design approach will be used to connect the cells and create a smooth workflow. *List of Different Functional Spaces:* 1. *Reception and Administrative Offices:* A welcoming area for visitors and employees, with a reception desk, waiting area, and administrative offices. 2. *Production Floor:* A large, open area where the soft drinks will be manufactured, with separate lines for different products and flavors. 3. *Packaging Area:* A dedicated space for packaging the soft drinks, with machines and equipment for labeling, bottling, and palletizing. 4. *Warehouse:* A secure, climate-controlled area for storing raw materials, finished goods, and packaging materials. 5. *Quality Control Laboratory:* A state-of-the-art lab for testing the quality and safety of the soft drinks, with equipment for chemical analysis and microbiological testing. 6. *Employee Facilities:* A comfortable area for employees to take breaks, with a cafeteria, restrooms, and locker rooms. 7. *Maintenance and Repair Area:* A dedicated space for maintenance and repair of equipment, with tools and spare parts. 8. *Energy Generation and Storage:* A room for housing the factory's energy generation and storage systems, such as solar panels and batteries. 9. *Water Treatment and Recycling:* A facility for treating and recycling water used in the production process, to minimize waste and reduce the factory's environmental impact. 10. *Security and Surveillance:* A room for monitoring the factory's security systems, with cameras and alarms to ensure the safety and security of employees and equipment. *Additional Features:* - A green roof or living wall to provide insulation and reduce energy consumption - A rainwater harvesting system to collect and reuse rainwater for non-potable purposes - Solar panels to generate electricity and reduce the factory's carbon footprint - Energy-efficient equipment and lighting to minimize energy consumption - A waste management system to minimize waste and promote recycling I hope this helps you design your soft drink factory!
View More
Attachment:
Status: Ongoing
Intention Submitted: 10/10
Time Left:
Intention List (10)
Name
C/R
Time Quoted
Type of Quotation
Ra****
Sri Lanka
2024-12-18 17:40:52
Active Quotation
ER********
Philippines
2024-12-18 15:40:35
Active Quotation
EM********
Ghana
2024-12-17 19:34:38
Active Quotation
Ja********
Pakistan
2024-12-17 17:21:23
Active Quotation
YI********
Ghana
2024-12-16 22:36:16
Active Quotation
OU********
Kenya
2024-12-16 17:57:18
Active Quotation
Me********
Fiji
2024-12-16 10:33:00
Active Quotation
AT********
Ghana
2024-12-13 18:46:02
Active Quotation
DU********
Turkey
2024-12-11 20:16:04
Active Quotation
Ar********
Philippines
2024-12-11 18:03:04
Active Quotation
View More
Comments
${0} Comments in Total ${0} Comment in Total
No Comments Now
Add a comment
* Language (Spoken):
Please select all your communication languages. This can help connect you with more requirements faster.
Official Recommended Communication Languages (Based on Location/Address You Enter): Please choose your address first. Official recommended communication languages will be displayed after you have selected the address.
Other Communication Languages: You can simply select from some international common languages.
+ Add More You can add other languages that are not shown above.
Cannot be blank !

Verification Failed:

* Language (Written):
Please select all your communication languages. This can help connect you with more requirements faster.
Official Recommended Communication Languages (Based on Location/Address You Enter): Please choose your address first. Official recommended communication languages will be displayed after you have selected the address.
Other Communication Languages: You can simply select from some international common languages.
+ Add More You can add other languages that are not shown above.
Cannot be blank !

Verification Failed:

If your languages are not shown above, please contact us: service@buildmost.com