Simple style WPC Wood Doors
Sakelli factory was started to be established in 2007. The factory which was established with the state-ofthe-art technology in a closed area of 30.000 m² started to the production in October 2007. Sakelli which was moved to its new place at the 3rd etape in 2013 and which is the largest factory of Turkey and Europe in its field makes production at the international quality standards in an integrated area of 550.000 m² in total. It has the capacity of producing 5.000 doors in a day. The production is performed with our 1.200 colleagues specialized in their fields.
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer