Structure: One door, Five shelves
The bearing weight of the shelf: 20Kg
Capacity: 326L
Sterilization temperature: 50-75 degrees
Disinfection type: Ozone + Infrared
Disinfection time: ≥ 30min
Rated Frequency:50 (Hz)
Rated Power : 600 (W)
Voltage : 220 (V)
Size: 575*510*1620mm
Material: Stainless Steel
Application: Restaurants and Hotels
Packaging & Shipping
Packaging Details: Foam + Carton +wooden Frame
Port: Guangzhou
Lead Time : Shipped within 3-7days after payment
Product Description
FEST Commercial Disinfection Cabinet, Big Capacity Ozone Disinfection Sterilizing Cabinet, Tableware Disinfection Cabinet
Feature:
1. Temperature below 70℃ keep you from danger of burning your hands.
2. It is made of good quality stainless steel, and tempered glass door, durable and easy to clean
3. With high-performance ozone sterilization technology, there is no dead angle for sterilization, so it is energy saving and environmental protection.
4. 360° Rotating timing switch button, you can set the sterilization time easy.
5. Large Capacity, it's suitable for daily use of tableware to meet your storage needs.
6. Suitable for hotel, government department,restaurant, school and any place needs disinfection.
Company Information
FAQ
1. What is your Minimum Order Quantity (MOQ)?
We are a manufacturer. MOQ usually is 1 unit.
We welcome wholesale and distribution, customization.
2. Can change the voltage and plugs or not ?
We are manufacturer, mostly products we can change the voltage and plugs. Pls kindly tell me the voltage and plugs that you need before the order.
3.What Methods of Payment Are Acceptable?
a.Telegraphic Transfer (T/T): we accept 30% T/T deposit before production and 70% T/T Balance before shipment. 100% payment for sample orders.
b.Western Union: we accept 100% payment via the western union.
4.What are the Costs of Shipping?
Shipping cost is based on the following elements:
Number of packages
Gross Weight
Package volume
Destination port
5.How About the Delivery Time?
Some of the products are in stock at our warehouse, generally we need 3~5 days to change the plugs before the delivery. Regarding to the non-stock products, the lead time depends on your requirement on the product.
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer