Floor Coating Series | |
waterborne factory anti dust epoxy floor paint | |
Key Specification | |
Warehouse, underground parking lot, workshop of mechanical enterprises, sports courts etc. require dust free ground, and can stand Vehicles (cars, forklift, cart). Therefore, the floors of these places not only have to be smooth, but only need strong wear resistance and stress resistance. Epoxy resin flooring system combines rolling surface stress resistant mortar with epoxy topcoat, produces strong wear resistant and press resistant floor. It is the professional solution for heavy machinery manufacture enterprise’s workshop, industrial and commerce warehouse, underground parking lot, etc. | |
Waterborne Epoxy Floor Coating | Features |
Corrosion resistance; | |
Excellent abrasion resistance | |
Easy for maintenance and low cost | |
Strong adhesion, good flexibility | |
Improving the concrete strength | |
Technical Parameters | |
Dry film thickness | 30mu/layer |
Theoretical coverage | 0.15kg/m2/layer |
Mixed using time | 8h |
Touch time | 4h |
Drying time (hard) | 3days |
Service life | 10-15 years |
Paint colors | Multi-color |
Self time | 1 year |
State | Liquid |
Application Guidelines | |
Tools | |
Application | |
widly used in floor coating of electronics factory, machinery factory, hardware factory, parking lot, etc. | |
Package | |
20kg/barrel | |
Storage | |
This product stored at above 0 °C, well ventilation, shady and cool place | |
Tool cleaning | |
Clean tools with clean water after immediate utilization. | |
Attentions | |
1. The product should be tightened and stored in a cool and dry place with temperature of 0-40°C and beyond the reach range of children; | |
2. Work under the environment with well-ventilated condition; | |
3. Goggles, gloves and special painting clothes, etc. should be used by constructors for protection in accordance with local working codes; | |
4. Once the paint splashes into eyes, please immediately clean them and go to the hospital for further advices; | |
5. Do not pour the paint residue into sewer to prevent blockage. Disposal of waste paint shall follow local environmental protection standards. | |
Payment and Delivery Terms | |
MIN Order Quantity | 1T |
FOB Port | GuangZhou or Zhongshan |
Payment Terms | L/C T/T |
Sample Available | Yes |
Delivery Days | 7days upon receipt of deposit |
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer