Cameroon, Central African Republic, Chad, Equatorial Guinea, Gabon, The Democratic Republic of Sao Tome and Principe, The Democratic Republic of the Congo, The Republic of Congo
Cameroon, Central African Republic, Chad, Equatorial Guinea, Gabon, The Democratic Republic of Sao Tome and Principe, The Democratic Republic of the Congo, The Republic of CongoProduct Description:
pany Brand: | Kun Da |
Original: | Tangshan, Hebei .China |
Material & Temper: | Alloy 6063-T5,6061-T6 , We will never use aluminum scrap. |
Surface Treament: | Mill-Finished, Anodizing, Powder Coating, Electrophoresis, Wood Grain, Polishing, Brushing, etc. |
Colour: | Silver, Champage, Bronze, Golden, Black, Sand coating, Anodized Acid and alkali or Customized. |
Film Standard: | Anodized:7-23 μ , Powder coating: 60-120 μ , Electrophoresis film: 12-25 μ |
Lifespan: | Anodized for 12-15 years outdoor, Powder coating for 18-20 years outdoor. |
MOQ : | 1 Ton. Usually 10~12 tons for a 20”FT; 20~23 tons for a 40HQ. |
Length: | 5.8M or Customized |
Thickness: | 0.2mm-20mm or Customized. |
Application: | Building and Construction and Decoration |
Extrusion Machine: | 600-2800 tons all together 10 extrusion lines. |
Capability: | output 1000 tons per month |
Profile type: | 1. Sliding window and door profiles; 2. Casement window and door profiles; 3. Aluminum profiles for LED light; 4. Tile Trim Aluminum profiles; 5. Curtain wall profile; 6. Aluminum heating insulation profiles, 7. Round/Square General profiles; 8. Aluminum heat sink; 9. Others Industry profiles |
Main Market & Market Share: | Algeria(15%), Angola(5%), Philippine(5%), Guinea(5%) , Ghana(5%) , South Africa(15%) , Nepal(2%) , Nigeria(25%) , Tanzania(10%) , Iraq(3%) , Others Market(10%). |
Free Moulds: | We have full set Free moulds of Algeria, Angola, Philippine, Guinea, Ghana, South Africa, Nepal, Nigeria, Tanzania, Iraq, And other models free Moulds. |
New Moulds & Moulds Cost Refund: | Opening new mould about 7-10 days, absolutely moulds cost can be refund. |
Free Samples: | Can be available all the time, about 1 days can be sent. |
Fabrication: | Die designing→Die making→Smelting&alloying→QC →Extruding→Cutting→Heat Treatment→QC→Surface treatment→QC→Welding→Packing→QC→Shipping→After Sale Service |
Deep Processing: | CNC/Cutting/Punching/Checking/Tapping/Drilling/Milling |
Certificate: | 1) ISO9001-2008/ISO 9001:2008; 2) GB/T28001-2001(including all the standard of OHSAS18001:1999) 3) GB/T24001-2004/ISO 14001:2004 4) GMC |
Payment: | 1. T/T: 30% deposite, the balance will be payed before delivery; 2.L/C: the balance irrevocable L/C at sight. |
Delivery time: | 15 days production 2. If opening mould, plus 7~10 days; |
FOB Port: | Tianjin Port, China |
OEM: | Available |
Packing/shipping:
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer