Product Description
Consulting products. Reward $50 product coupons
Introduction
Instructions
1. The coating can be used by directly adding water and stirring evenly into a thick slurry:
2. Spray the tunnel from the waist to the top(from the bottom) with a sprayer, spraying 3-8MM each time;
3. After the first spray is basically dry, continue spraying for the second time, so that the spraying thickness is:
4. Because the spray surface is not smooth enough, after the last spray, it is necessary to use the slurry to fill the surface manually., trim, Make the coating surface smooth and smooth, and ensure that the coating to achieve the design thickness.
5. If you need to spray fire paint, you can use the company's production of special paint.
FIRE RESISTANCE TIM | 2.0 | 2.5 | 3.0 |
COATING THICKNESS (MM) | 13 | 18 | 25 |
MATERIALCONSUMPTION (kg/㎡) | 10 | 16 | 20 |
Precautions
1. Once the coating packaging bag is opened, it should be used immediately, and the coating with dampness and agglomeration shall not be used.
2. The construction process can be appropriately adjusted according to the design thickness and construction conditions of the coating.
3. The maintenance period is 35 days
Packing and shipping
1. The inner bag is sealed by high-strength plastic bag and the outer belt is packed by ordinary woven bag
2. This product is stored in a cool and dry place indoors, which is rainproof and moisture-proof.
3. This product is non-toxic, tasteless and non-dangerous, and can be transported as general cargo.
4. Shelf life of the product: 6 months (agglomeration is strictly prohibited)