x
Post
Consult
IM
Feedback
Top
*标题:
*内容描述:
Home Ceiling,Roofing Materials & Coating Engineering Coating Fire-proof Coating Liaoning Maiqi New Material Group Co., Ltd. INDOOR THICK STEEL STRUCTURE FIREPROOF COATING

Turn Back

Supplier: Liaoning Maiqi New Material Group Co., Ltd.Go to Homepage >>
Office Location: Diaobingshan City, Tieling, Liaoning, China, East Asia Diaobingshan City, Tieling, Liaoning, China, East Asia
Type of Supplier: Manufacturer
Established Year: 2015
Annual Revenue: Below US$1 Million
Total Employees: 50-100 People
Liaoning Maiqi New Material Group Co., Ltd.
INDOOR THICK STEEL STRUCTURE FIREPROOF COATING

INDOOR THICK STEEL STRUCTURE FIREPROOF COATING

FOB:  USD 9.9 - 11.5 Kg(s)
Model: NH-MQ03
Min. order: 500 Kg(s)
Terms of Payment: T/T,L/C,D/A
Sample: Charge
Main Port of Export: dalian
Product Details

image.png

Component


The main mechanism of action is: after a fire, the thickness does not change, mainly relying on its own non-combustibility and low
thermal conductivity to prevent heat transfer pass. This product cancels the traditional construction technology of sticking nails
and hanging nets, and adopts direct spraying or wiping method.

Application


1.  Before construction, the oil stains, dust, etc. on the surface of the steel components to be coated must be removed. After
   confirming that there is no leakage of the anti-rust paint on the surface of the steel structure, the construction can begin.
2.  In order to enhance the bonding strength between the coating and the steel components, the fireproof primer should be sprayed
   first during the construction, the degree of engagement is 3-5mm, and the air compressor pressure should be maintained at
   0.4-0.6Mpa.
3.  After the surface of the fireproof primer is dry, spray (wipe) the fireproof coating. The fireproof paint is used after
   mixing with water according to the degree of dilution required for construction. Spray each layer (wipe

-coating) thickness should be 58mm, and the spraying interval should be based on the surface dryness (not sticky to the hands),
and the number of wiping times should reach the thickness requirement.
4.  During the construction process and before the coating is dry-exploded and solidified, the ambient temperature (keep at 5-40C
   and the relative humidity is not more than 90%, when there is condensation on the surface of the component and rainy days, not
   suitable for coating.
5.  Powder: liquid = 3:2, the mixing ratio can be appropriately increased or decreased according to the thinness and consistency
   required by the construction.

Parameter

Physical and chemical reference

It is water-based, pollution-free, environmentally friendly, and has light capacity, with excellent performance and anti-aging
characteristics.

Use


Suitable for fire protection of various reinforced concrete steel structures and steel structures. It can be widely used in
large-span structures and high-rise buildings that require fire protection, such as petroleum, chemical industry, garage industry
and civil buildings.


Comments
${0} Comments in Total ${0} Comment in Total
No Comments Now
Add a comment
Company Information
Company Profile
Brand
Service Area
Asia
Europe
Africa
America
Other
Production/Supply Capacity
Factory Basic Information
Case Name: Statement: Contents above are uploaded by the design service
Head Office
Branch
* Language (Spoken):
Please select all your communication languages. This can help connect you with more requirements faster.
Official Recommended Communication Languages (Based on Location/Address You Enter): Please choose your address first. Official recommended communication languages will be displayed after you have selected the address.
Other Communication Languages: You can simply select from some international common languages.
+ Add More You can add other languages that are not shown above.
Cannot be blank !

Verification Failed:

* Language (Written):
Please select all your communication languages. This can help connect you with more requirements faster.
Official Recommended Communication Languages (Based on Location/Address You Enter): Please choose your address first. Official recommended communication languages will be displayed after you have selected the address.
Other Communication Languages: You can simply select from some international common languages.
+ Add More You can add other languages that are not shown above.
Cannot be blank !

Verification Failed:

If your languages are not shown above, please contact us: service@buildmost.com