Overview
Quick Details
Place of Origin:
Guangdong, China (Mainland)
Brand Name:
Xingfa
Model Number:
Chuango(US-1) Fully-exposed-frame Series
Material:
Aluminum Alloy
Alloy:
6063, 6063A, 6061, 6082, 6005, 6106, 6101,6351
Temper:
T4,T5,T6
Surface Finshing:
Mill Finished, Anodizing, Electrophoresis, Powder Coating, PVDF
Glass:
Single or Double Glass
Thickness:
up to 2.0mm
Price:
Negotiation
Price Term:
FOB, CIF
Supply Ability
Supply Ability:
500000 Ton/Tons per Year
Packaging & Delivery
Packaging Details
Non-woven fabrics interlayer with Xingfa logo paper
Port
Guangzhou
Lead Time :
20-30 days
Products Show
Product Description
1.Material: AL 6063, 6063A, 6061, 6082, 6005, 6106, 6101,6351
2.Temper: T4,T5,T6
3.Quality Standard: GB/T5238.1-2008
4.Surface Finshing: Mill Finished, Anodizing, Electrophoresis, Powder Coating, PVDF, Wooden Finishes
5.Features:
·High Universality
The same system can combine exposed frame, hidden frame and semi-hidden frame freely.
·Indoor Visual Area Simple and Unified
Hidden frame curtain wall hide sub-frame in the rabbet of joist. The effect of exposed frame, hidden frame and semi-hidden frame in indoor visual area is concordant. Meanwhile, it also solve the common problem of traditional hidden frame that sub-frame is not on the same level with joist due to the the error of machining install.
·Good Mechanical Property of Section
Compared with traditional open-ended profile, crossbeam is closed-ended profile, which not easy to be out of shape under the effect of panel weight.
·Optimizing Surface Treatment of Sub-frame
Glass sub-frame doesn’t need special surface treatment. Because sub-frame is hidden in the rabbet of joist, whatever the joist use any surface treatment and the sub-frame still use anodizing.
·Convenient the Connect Way of Main Column and Crossbeam
The back-end of crossbeam use stainless spring bolt. The front-end use aluminium connector and have effective connect with main column spring bolt and connector are pressed together, which reduce the crossbeam deformation lead by the weight of board. Meanwhile, it also solve the problem that the closed-ended crossbeam need to be installed.
·Saving the amount of profile.
Combined with our company production equipment and technics, the amount used of curtain wall per square meter can save 1-2kg compared with the mainstream market system profile.
Product Name | Xingfa Curtain Wall Chuango (US-1) Fully-exposed-frame Series |
Material | aluminium alloy |
Thickness | 1.2mm |
Packing | protective film, compound kraft paper, shrink film, plastic interlayer, XINGFA logo paper, wooden case, carton or other material client's preference |
Origin | Foshan, China |
Our Service
Have passed the ISO9001 quality management system, ISO14001 environment management system.
We own the largest and most advanced vertical spraying and electrophoresis production line introduced from Japan.
We support enterprise technology innovation work strongly and increase science and technology fund.
We have built the first national certification laboratory that is the physical and chemical testing center.
Our company is the first enterprise to apply "ERP modern management information network project".
We establish professional technical service team to provide technical support and services for aluminium profile.
Our Company
Xingfa head office is located in Foshan, Guangdong, China.
Factory
Xingfa biggest branch factory- Foshan Branch
Xingfa powder coating workshop
Xingfa mould workshop
Xingfa extrusion workshop
Xingfa museum
Packing
Normal Packing Details : non-woven fabrics interlayer with Xingfa logo paper
Other Packing Details: protective film, compound kraft paper, shrink film, plastic interlayer, XINGFA logo paper, wooden case, carton or other material client's preference
Our Certifications
AkzoNobel Platinum Interpon D Approved Applictor
No.1 of China Architectural Aluminium Profile Top 20
Our Customer
FAQ
A: We are factory.
A: Generally it is 20-30 days for production if the goods are not in stock, it is according to quantity.
A: Yes, we could offer the sample for free charge but do not pay the cost of freight.
A: Payment<=1000USD, 100% in advance. Payment>=1000USD, 30% T/T in advance ,balance before shippment.
If you have another question, pls feel free to contact us as below:
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer