Overview
Quick Details
Place of Origin:
Guangdong, China
Brand Name:
sy
Model Number:
SY_2071
Open Style:
Swing
Position:
Exterior
Surface Finishing:
Finished
Type:
Security Doors
Door Material:
steel+MDF
Size:
2050*960*100mm, can be customized
OEM:
Available
Door leaf thickness:
70/80/90mm
Infilling:
honeycom material and anti-fire board material
Accessories:
viewer, doorbell, installing bolts, plastic cover, rubber seal
Lock:
Specialist security lock with 15 locking points
Function:
water proof, sound proof, fire resistance.
Guarantee:
30 years
style:
turkey luxuery front door desgin
Color:
Requirement
Supply Ability
Supply Ability:
10000 Set/Sets per Month
Packaging & Delivery
Packaging Details
Film enwipapped on surface, strong EPE packing inside, hard carton outside 1. 90-130pcs/20Ft 2. 180-260pcs/40Ft 3. 225-305pcs/40HQ
Port
Huangpu port/Sansan port
Lead Time :
Quantity(Sets) | 1 - 10 | 11 - 100 | >100 |
Est. Time(days) | 35 | 45 | To be negotiated |
Product Description
Latest design bullet security steel wooden single metal armored door
Detail product description: | |
Door type: | Armored door |
Material: | Steel wood material door |
Size(mm): | 2050*960*100 (H*W*T/mm), customized is ok |
Color: | Available in all designs and colors |
Surfact finishing: | Finished |
infilling | Honeycomb material and polyurethane and silicic aluminum and anti-fire board material. |
lock | security lock with 15 locking points. (alternative available) |
Veneer: | Available in any veneer you like |
Accessories: | Hinges, locks, handles, viewer, doorbell, rubber seal, installing bolts |
Opening direction | Inward/ outward |
Function: | sound proof, water proof, Slight fire resistance |
Packaging: | Film enwipapped on surface, strong EPE packing inside, hard carton outside |
Delivery time: | Within 30 days after received the order |
Payment terms: | L/C,T/T,Cash,30%deposit in advance, balance will be pay off before loading by T/T |
MOQ: | 10 pcs |
Supply ability: | 1000 pcs one month |
Remark: | All kind of designs can be produced according to your requirements |
Door constrution
Door frame architrave can be selected .
PU paint polished, lots of colors for your reference ( customized is ok )
More products ,please kindly to click the picture and visit!
Packaging & Shipping
Film enwipapped on surface, strong EPE packing inside, hard carton outside for Steel wood dor
Company Information
1. We foshanshengyi door industry is belong to SY Door Group.
2. We now have our own Industrial zone in FOSHAN( over 60000 square meters), big showrooms in Foshan.
3. All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
4. Best after sale service, customer can follow their order situation any time, no matter on product line, warehouse or shipment.
5. More than10 years experience in exporting to make your order more smooth.
6. Less than one container loading is accepted.
7. On time delivery, in general 25-30 days.
8. Multimode payment:T/T,L/C,Western Union,D/P,Escrow,Cash..
9. Special dimensions available according to request.
10. Our company works on the principle: Honesty is the best Policy.
The certification
Our Services
1. We Foshan shengyi door industry is a company of industry and trade integration.
2. We now have our own factory and trading company in Foshan. We have best online service.
We also can send a car to pick you up when you arrive Guangdong and have a willing to visit us.
3. All of our goods will pass THREE QUALITY INSPECTIONS before shipment.
4. Best after sale service, customer can follow their order situation any time, no matter product line,
warehouse or shipment.
5. More than 10 years experience in exporting to make your order more smooth.
6. Less than one container loading is accepted.
7. On time delivery, in general 25-30 days.
8. Multimode payment: T/T, L/C, Western Union, D/P, Escrow, Cash.
9. Special dimensions available according to request.
10. Our company works on the principle: Honesty is the best Policy.
FAQ
Q: Are you doors' manufacturer?
A: Yes, we are, we can provide excellent goods at competitive price
Q: What is your delivery date?
A: It depends. Normally, 20-30 days after received the 30% deposit and confirmed all the detail
Q: Where is your factory located? How can I visit there?
A: We are located in NO.95 Shangang New Road Shiwan Town Chancheng Area Foshan City.All our clients from home and abroad are warmly welcome to visit us.
Q: Where is your main market?
A: Our main market is in the Middle East, South America and Southeast Asia, Euro, North America, more than 100 countries
Q: Can we use our shipping agent?
A: Yes, you can. We had cooperated with many forwarders. If you need, we can recommend some forwarders to you and you can compare the prices and service.
Q: where is our port of shipment?
A: Foshan/Guangzhou, China
Q: How long can I get samples?
A: 10-20 days to send sample via DHL, UPS or other international express.
Q:Which is your min order?
A: 10 sets
Q:What is your payment terms?
A: 30% TT as deposit in advance, 70% balance before loading.
Any query,please feel free to contact me!!!
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer