x
Post
Consult
IM
Feedback
Top
*标题:
*内容描述:
Home Ceiling,Roofing Materials & Coating Engineering Coating Water-proof Coating Beijing Oriental Yuhong Waterproof Technology Co., Ltd. Two Components Polyurethane Waterproof Coating

Turn Back

Supplier: Beijing Oriental Yuhong Waterproof Technology Co., Ltd.Go to Homepage >>
Office Location Beijing City, Beijing, China, East Asia Beijing City, Beijing, China, East Asia
Type of Supplier: Manufacturer
Established Year: 2013
Annual Revenue: US$10 Million-US$50 Million
Beijing Oriental Yuhong Waterproof Technology Co., Ltd.
Two Components Polyurethane Waterproof Coating

Two Components Polyurethane Waterproof Coating

Model: SPU-311
MOQ: 3000 Kg(s)
Terms of Payment: T/T,L/C
Sample: Charge
Main Port of Export: Shanghai
Product Details
Min. Order:3,000 KG
Port:Shanghai, China 
Payment Terms:L/C, T/T, Western Union
Type:Waterproof Paint
Ceiling Tile Shape:Liquid
Material:PU
Function:Waterproof
Certification:MSDS
Color:Brown

Basic Info

Model NO.

SPU-311

Usage

Outdoor

31bf6f5c17e40baec250a4d0dd573b4.png

Description
SPU-311 is a synthetic polymer waterproof coating by two components reaction. Component A is a polyurethane prepolymer through the reaction between polyether polyol and isocyanate. Component B is a colorful liquid consisting of plasticizers, curing agents, thickeners, coagulants and fillers.

Where to use
Undergrounds, cold stores and grade;
Bathroom, kitchen and pools;
Hard to dry substrate of underground construction;
Subways, channels, bridges, tunnels and unexposed roofs;

Advantages
Can be applied on the wet underground substrate with strong bonding power;
Multipurpose to apply on horizontal planes, vertical planes and top planes;
Seamless, no pinholes and bubbles;
Liquid with cold applied;
Fast solidify and convenient to apply.

Standards
ASTM C 836

Packaging
Component A and B of SPU-311 are sealed in 8kg and 20kg pails, respectively, transported in wooden cases. Each wooden case can be contained 48 pails of component A or 36 pails of component B.

Storage
SPU-311 material should be stored by sealed pails at dry and well-ventilated places and protected from sun or rain. The temperature in stored places can not be higher than 40° C. It can not be closed to fire sources. The normal shelf life is 12 months.

Transportation
SPU-311 is needed to be avoided sunshine and rain. Fire sources are forbidden during transportation.

Application System

Constructive System
The system is basically consisted of substrate, additional layer, waterproof coated membrane and protection layer.


Coverage
1.7kg per m2 gives dft 1mm minimum. Coverage may vary with the substrate condition during application.

Mixing
The ratio of component A to B is 1: 2.5 according to the construction amount.

Application Method
Surface preparation
Surfaces should be dry, stable, clean, smooth, without pockmarks or honeycombs and free from any dusts, oil or loose particles. Cracks and surface irregularities need to be filled by sealants and do additional waterproofing. For smooth and stable surfaces, this step can be skipped.

Additional layer
Paint SPU-311 as additional layer to enhance at internal and external corners, drain pipes, floor drains or embedded parts.

Application of waterproof coated membrane
It can use rubber scrapers or spray equipments to paint 2 or 3 times. After fully dry, it can be painted again. The normal time between each painting is 24 hour. The direction of second time painting needs to be perpendicular to the first time painting.

Application of protection layer
After waterproof coated membrane is fully dry and meets quality requirements, it can begin application of protection layer.

Notice

The temperature for application of SPU-311 should be above 5 ° C.
SPU-311 has to be used out as soon as possible and no more than 20 minutes once opened. It can not be exposed to the air for a long time.
The storage and application places should be well-ventilated and no fire.

ItemRequirementTest Method
Hardness≥50ASTM D 2240
Weight Loss≤20%ASTM C 1250
Low temperature crack bridgingNo crackingASTM C 1305
Film thickness(vertical surface)1.5mm±0.1mmASTM C 836
Adhesion-in-peel after water immersion175N/mASTM C 794
Optional test after adhesion in peelNo separation at surfaceASTM C 836
Extensibility after hear aging6.4mm (note 1) no crackingASTM C 1522
Stability≥6 monthsASTM C 836


Comments
${0} Comments in Total ${0} Comment in Total
No Comments Now
Add a comment
Company Information
Company Profile
Brand
Service Area
Asia
Europe
Africa
America
Other
Production/Supply Capacity
Factory Basic Information
Case Name: Statement: Contents above are uploaded by the design service
Head Office
Branch
* Language (Spoken):
Please select all your communication languages. This can help connect you with more requirements faster.
Official Recommended Communication Languages (Based on Location/Address You Enter): Please choose your address first. Official recommended communication languages will be displayed after you have selected the address.
Other Communication Languages: You can simply select from some international common languages.
+ Add More You can add other languages that are not shown above.
Cannot be blank !

Verification Failed:

* Language (Written):
Please select all your communication languages. This can help connect you with more requirements faster.
Official Recommended Communication Languages (Based on Location/Address You Enter): Please choose your address first. Official recommended communication languages will be displayed after you have selected the address.
Other Communication Languages: You can simply select from some international common languages.
+ Add More You can add other languages that are not shown above.
Cannot be blank !

Verification Failed:

If your languages are not shown above, please contact us: service@buildmost.com