Overview
Quick Details
Place of Origin:
Zhejiang, China
Brand Name:
HMT
Model Number:
H5211717C
Surface Finishing:
Chrome
Feature:
Thermostatic Faucets, Electric Faucets
Surface Treatment:
Polished
Installation Type:
Deck Mounted
Number of Handles:
Single Handle
Style:
Contemporary
Valve Core Material:
Ceramic
Number of Holes for Installation:
Single Hole
Spray Type:
Pull Down
item:
kitchen grohe faucet
valve material:
ceramic
brand:
OEM/ODM
material:
brass body zinc alloy handle
finishing:
polishig
surface treatment:
chrome
warranty:
5years
salty water test:
over 24hours
water pressure:
1.6mpa
air prerssure:
0.6mpa
Supply Ability
Supply Ability:
100,000 Set/Sets per Month
Packaging & Delivery
Packaging Details
inner bubble bag+outer carton box. 12sets per box
Port
Shanghai/Ningbo
Lead Time :
witin 7 days after receiving deposit or opening L/C
2014 high quality Brass Flexible Faucet
1)brass body zinc alloy handle
2)500000 circles
2014 high quality Brass Flexible Faucet
Technical Databse
Material | Brass body + zinc lever |
Finish | Chrome plated Antique Bronze, Brushed Nicked, Gold etc. available |
Handle | Single levers |
Cartridge | - 35/40mm ceramic cartridge - 500,000 life cycles - Sedal, Keros, SCC, Kone, Hain-Yo, KCG etc. available |
Water Pressure Testing | 1.6 Mpa |
Configuration | single hole installation |
Fittings | Brass or Stainless Steel Fittings |
Warranty | 5 years |
Certification | ISO9001, CE and ACS approved |
OEM&ODM Service | Provided |
We were established in 1989 as a developer and manufacturer of faucets and bathroom accessories. Over decades, our main products series have been expanded to basin faucet, bathtub faucet, kitchen faucet, shower faucet and stainless steel hose, totally for almost 40 series. We persist in our mission statement of "To Provide the Highest Quality Products with the Lowest Total Cost that Meet or Exceed Our Customers' Requirements in a Timely Manner". The sequential QA and QC procedures are as follows:
1) Material inspection
2) Chemical examination lab
A system to test and control compositions of original materials:
1) A test and validation program was developed whereby all of our products are sampled and inspected. The results are submitted for comparison with test results.
2) Establish a procedure to check products at all stages of the manufacturing process from raw materials, in-process materials and validated or tested materials to finished goods. Besides, we have also developed a procedure which identifies the inspection and test status of all items at all stages of the manufacturing process
3) There is a system that tracks in-process defects and other non-conformances. These records are used to analyze root causes and solve the problems
4) We have established a quality manual, which is maintained as means to ensure that products conform to specified requirements
5) 100% inspection in assembly lines: all controls, inspections, equipment, fixtures, total production resources and skills are inspected to consistently achieve the required quality levels
Verification Failed:
Verification Failed:
Comments
Feedback from Buyer